Design Build

Our Design-Build service integrates design and construction under a single point of responsibility, enabling precise control of schedule, cost, and risk from the earliest project stages.

By incorporating technical insights on structure, MEP systems, and site conditions during early design, we minimize the gap between design intent and construction reality. Drawing from extensive experience across Federal Military, Public, and Private sector projects, we maintain consistent standards and accountable leadership throughout the entire process.

Allstate Value Grid

Early Integration for Decisions

From day one, we provide practical structural, MEP, and field-operations input, reducing redesigns and aligning with owner goals.

Minimizing the Gap

We refine details to align with real-world parameters, enabling first-pass design clarity and maximizing overall project efficiency.

Single-Point Responsibility

Critical decisions are led by accountable senior leadership, ensuring integrated management of budget, schedule, quality, and risk.

Continuous Collaboration

Rapid feedback loops synchronize design, engineering, and construction, creating actionable solutions and enhancing execution speed.

Proactive Risk Mitigation

We identify procurement challenges and sequencing risks early. Our proven risk-management process stabilizes both cost and schedule.

Proven Design-Build Ecosystem

We assemble project-specific teams from a vetted network of partners, providing stability especially on complex projects.

Key Capabilities

End-to-End
Design-Build Capabilities

We streamline the construction process with single-point leadership, ensuring every detail from cost modeling to permitting is handled with precision and ownership.
  • Design-Build Delivery Management

    Single-point leadership across the entire process

  • Conceptual Budgeting & Cost Modeling

    Structural, MEP, and systems strategy assessment

  • Early Design Participation & Technical Review (Structural, MEP, and systems strategy assessment)

  • Value Optimization & Lifecycle Analysis

  • Constructability Review

    Design details, systems, and site conditions integration

  • Integrated Scheduling

    Milestones, baseline development, phasing strategies

  • Procurement Strategy

    Long-lead items and strategic packages early release

  • Logistics & Site Planning

  • Permitting Coordination

  • Cost & Schedule Risk Analysis

  • Design Coordination with Architecture & Engineering Partners